Requirement 6 · Develop and maintain secure systems and software

6.5 Changes to all system components are managed securely

SCOPEEVIDENCERISKEVIDENCETESTEVIDENCEREPORTEVIDENCEAUDIT TRAIL6.5 Audit PathPOLICY / CONTROL / EVIDENCE / REVIEW

How to meet it

Apply change control with documentation, testing, approval and rollback.

Defined requirements

The individual PCI DSS v4.0.1 requirements under 6.5, in plain English.

6.5.1Changes to production components follow procedures capturing reason, security impact, approval, testing, and rollback.
6.5.2After a significant change, all applicable PCI DSS requirements are confirmed in place on affected systems and documentation updated.
6.5.3Pre-production environments are kept separate from production, enforced by access controls.
6.5.4Roles and functions are separated between production and pre-production for accountability.
6.5.5Live PANs are not used in pre-production unless that environment is in the CDE and fully protected.
6.5.6Test data and test accounts are removed before a system moves into production.

Policy templates for this control

Use these starting documents to turn the control into evidence. Adapt each template to your scope, systems, legal obligations and actual operating process.

Open the control-to-policy map
Back to Requirement 6, or see PCI DSS templates. To run PCI controls with automation, read how AI manages controls.